estimate construction costs26 February 2026

A Developer's Guide to Estimate Construction Costs in the UK

By Domus

If you want to estimate construction costs properly, you have to treat it as a core strategic task, not just an administrative box to tick. A real estimate goes way beyond a simple per-square-metre guess. It demands a detailed breakdown of every hard cost (labour, materials), soft cost (fees, surveys), and a sensible contingency. This process is your first and best defence against profit erosion and the key to getting lenders on board.

Why Accurate Cost Estimation Is Your Most Critical Task

In UK property development, a bad cost estimate isn't just a miscalculation; it’s a project killer. Before you even touch a spreadsheet, you need to understand what’s on the line. This isn’t just about numbers—it’s about deploying capital intelligently, managing risk, and the fundamental viability of your entire scheme.

Getting this wrong has real, often painful, consequences. Underestimate your costs, and you can watch your profit margin evaporate, turning what looked like a great project into a loss-making headache. This is the fastest way to sour a relationship with a lender. They see budget overruns as a glaring sign of poor due diligence and a direct threat to their capital.

The Real-World Impact of Flawed Estimates

Think about two different residential projects. A small conversion in Manchester might seem straightforward, but if unforeseen ground contamination crops up, your site costs could easily double. Over in a prime London borough, a new-build scheme could hit unexpected planning hurdles that demand expensive redesigns and a battery of specialist reports. Every project has its own financial DNA, shaped by its location, complexity, and the local regulatory minefield.

Insight: A cost estimate is not a static document; it’s a dynamic forecast in a volatile market. Viewing it as a box-ticking exercise is the fastest way to undermine your project's potential before a single brick is laid.

But overestimating is just as dangerous. By padding your numbers "to be safe," you can make a perfectly viable project look like a non-starter. This kind of conservatism means you’ll walk away from profitable opportunities or fail to secure funding because the projected returns look too weak. Ultimately, getting a true read on your project viability is the absolute foundation of successful development.

Navigating a Volatile Market

The market we're in now makes this all the more critical. Construction output prices in the UK shot up, peaking with over 10% year-on-year growth in mid-2022 thanks to rampant inflation and broken supply chains. While things have calmed down a bit, labour costs—which now make up a huge 58% of sector earnings—have kept climbing faster than revenue. That puts immense pressure on every single build budget. You can dig into these construction market trends on Statista.

This volatility means a back-of-the-envelope guess just won’t cut it anymore. The ability to accurately estimate construction costs is no longer just a calculation; it's your most important strategic advantage. It’s what ensures you put capital to work effectively and actually hit the returns you’re targeting.

Right, let's get past the simplistic per-square-metre guesses. They’re fine for a back-of-the-envelope check, but they will crumble under the first bit of scrutiny from a lender or investor. To get a project properly funded, you need to move beyond averages and build a robust, bottom-up budget. This is your financial blueprint, and it needs to give you, your partners, and your finance providers total confidence.

The only way to do this properly is to break the development budget down into its three core pillars. Each one captures a different type of spend, and understanding how they fit together is the key to building an estimate that actually holds up.

Hard Costs: The Bricks and Mortar

Hard costs are the most obvious expenses—the physical stuff. They cover all the materials and the direct labour needed to put it all together on site. This is everything from the concrete in the foundations to the final lick of paint on the skirting boards.

A classic mistake is just lumping all this together. You can't. You have to break it down by trade, creating individual budget lines for each specialist job. It’s more work upfront, but this detail makes your estimate far more accurate and infinitely easier to track once you're on site.

For a typical four-unit residential scheme, your hard cost breakdown should get into specifics like:

  • Groundworks and Substructure: All the excavation, foundations, drainage, and damp-proofing.
  • Superstructure: The main building frame, whether that’s timber, steel, or traditional masonry.
  • External Finishes: The brickwork, cladding, roofing, windows, and doors that make it weathertight.
  • Internal Finishes: All the plastering, flooring, joinery, and decoration.
  • Mechanical & Electrical (M&E): Plumbing, heating, ventilation, and every last socket and switch.

Practical Insight: The real power here is clarity. When you know exactly where every pound is meant to go, you can make smarter decisions, negotiate harder with suppliers, and spot a potential overspend before it spirals out of control.

Soft Costs: The Professional and Statutory Fees

Soft costs are the less tangible but equally critical expenses that make a project possible. Think professional services, council fees, and other non-construction items. Be warned: these can easily add 20-30% to your total project cost if you don't track them meticulously.

Underestimating these is one of the fastest ways to get into financial trouble. Your soft cost schedule needs to account for every single professional and approval required.

Key soft costs you absolutely must include are:

  • Professional Fees: Architects, structural engineers, quantity surveyors, and project managers.
  • Statutory and Legal Fees: Planning applications, building control submissions, CIL (Community Infrastructure Levy) payments, and all your legal conveyancing costs.
  • Surveys and Reports: Topographical surveys, ground investigation reports, and environmental assessments.
  • Finance and Marketing: Loan arrangement fees, interest costs during the build, sales agent commissions, and marketing collateral.

Site Costs: Preparing the Canvas

Finally, there are the site costs. This covers all the work needed to get the site ready for construction and manage it effectively throughout the build. These are often front-loaded costs that you have to pay out before the main construction work can even start.

These are completely site-specific. A clear, flat plot will have minimal prep costs. A tight urban site with an old building on it? You’re looking at a serious budget for demolition, potential remediation, and complex logistics.

You have to account for:

  • Site Preparation: Demolition, removing hazardous materials like asbestos, and any land remediation needed.
  • Utilities: The cost of getting new connections for water, gas, electricity, and telecoms.
  • Site Logistics: Hoarding, security, site access roads, and temporary welfare facilities for the team.

This whole process is about risk management. A poor estimate can sink a project, whereas an accurate one becomes a genuine strategic advantage.

A process flow diagram illustrating cost estimation risks: bad estimate, project killer, and strategic advantage.

The takeaway is simple: cost estimation isn't just an admin task. Its outcome directly determines whether your project succeeds or fails.

Bringing It All Together: A UK Example

To give this some real-world context, here’s a high-level look at how costs might be allocated for a small residential scheme in the UK. This isn’t a template—your numbers will vary—but it illustrates the typical weight of each category.

Sample Build Cost Breakdown for a 4-Unit UK Residential Scheme

Cost Category Example Cost Component Typical % of Total Build Cost Notes for Estimation
Hard Costs Substructure, Superstructure, M&E 50-60% Highly variable based on specification. Obtain quotes from at least three contractors.
Soft Costs Professional Fees, Statutory Charges 10-15% Often a percentage of hard costs, but some fees (e.g., planning) are fixed.
Site Costs Demolition, Utilities, Preliminaries 10-15% Very site-specific. Requires detailed site investigation to price accurately.
Finance Costs Arrangement Fees, Interest 5-10% Dependent on the lender, LTV, and project duration. Model this carefully.
Contingency Unforeseen Events 5-10% Non-negotiable. Lenders will insist on it, and you'll almost certainly need it.
Developer Profit Target Margin 15-20% of GDV The ultimate goal. This is your return for the risk and effort involved.

Remember, regional variations are huge. A bricklayer in the South East might charge £250-£300 per day, but their counterpart in the North West could be closer to £180-£220. This is precisely why generic national averages are so dangerous. You have to use local data.

To really get under the skin of your project’s finances, you have to build a proper underwriting model. We’ve put together a detailed guide on how to create a spreadsheet for the true cost of underwriting a development project that walks you through it.

By building your cost plan with this three-pillar structure—Hard, Soft, and Site costs—you create a document that is clear, defensible, and ready for any lender to inspect. It stops being a guess and becomes a well-reasoned financial plan.

Accounting for Preliminaries, Contingencies, and Inflation

A cost plan built on hard and soft costs alone is dangerously incomplete. It’s like planning a long road trip by only budgeting for petrol and snacks, completely forgetting about hotels, breakdown cover, or the very real possibility of fuel prices jumping mid-journey.

To estimate construction costs with any real accuracy, you have to get your head around the variables that sit outside the direct construction work: preliminaries, contingencies, and inflation.

Getting these right is what separates a professional, lender-ready estimate from a hopeful guess. They represent the project's running costs, the safety net for unknowns, and your defence against market volatility. Ignore them, and you’re setting yourself up for budget overruns and panicked calls to your finance provider.

A 'Contingency Fund' sign on a wooden table with a calculator, documents, and a hard hat at a construction site.

Unpacking Preliminaries: The True Cost of Running a Site

Preliminaries, or 'prelims', are the essential site-specific overheads needed to actually manage the project. They aren't the bricks and mortar, but without them, no bricks get laid. A common mistake is to just slap a vague percentage on the total, but a robust estimate breaks them down properly.

These costs generally fall into two buckets:

  • Time-Related Costs: These are directly tied to your project's duration. Think site management salaries, hoarding, security, welfare facilities (toilets, canteen), and plant hire like scaffolding or cranes. The longer the project runs, the higher these costs climb.
  • Fixed Costs: These are one-off expenses to get the site up and running. This could be the initial site setup, getting temporary utilities connected, or specific surveys you need during the build itself.

For a typical UK residential project, prelims can easily eat up 10-20% of your total build cost. If your project overruns by just three months, those time-related prelims will add a significant, unbudgeted chunk to your final bill.

Practical Insight: Think of prelims as the project's burn rate. For example, if your site manager, security, and plant hire cost £5,000 per week, a one-month delay costs you £20,000 before you've even bought an extra brick. Properly itemising them turns a mystery number into a manageable, trackable part of your budget.

Building a Risk-Based Contingency Fund

Contingency isn't a slush fund for nice-to-have changes; it’s your financial buffer for genuine, unforeseen risks. Simply adding a flat 5% or 10% without any real justification is lazy and won’t impress a lender. A professional approach means building a contingency based on a proper risk assessment.

Start by listing the specific risks for your project. What could realistically go wrong?

  • Ground Conditions: Are you absolutely certain about soil stability? Could there be contamination that a survey didn't spot? This is a massive source of cost blowouts.
  • Planning Conditions: Does your planning permission have some tough conditions that could be expensive to sort out?
  • Supply Chain Issues: What if a key material, like specialist cladding, suddenly rockets in price or gets hit with a long lead time?
  • Existing Buildings: On a refurb, what hidden structural problems or hazardous materials might you uncover once you start opening things up?

Once you have your list, assign a probability (low, medium, high) and a potential cost impact to each risk. This turns a vague worry into a quantifiable financial threat. Your contingency fund should be a sum that directly relates to the high-probability, high-impact risks you've identified. Lenders love this evidence-based approach because it shows you’ve thought critically about what could go wrong.

Factoring in Inflation: The Silent Budget Killer

In a volatile market, inflation can quietly eat away at your profit margin over the life of a project. A scheme costed today could easily be 5-10% more expensive to build in 18 months. You have to make a realistic provision for both material and labour cost inflation.

Don't just guess. Use established data sources to back up your forecast. UK-specific indices from the Building Cost Information Service (BCIS) provide detailed forecasts on everything from material price changes to labour wage inflation. Using these demonstrates a professional, data-led approach to your budget.

For example, if you have a 24-month build programme, you shouldn't just apply an inflation rate to the total cost. You need to phase it in line with your cash flow. The materials you’re buying in month 18 should be costed at a higher rate than those you buy in month 3. It's this level of detail that makes an estimate robust and, crucially, defensible.

Finding Reliable UK Cost Data for Your Project

Your cost estimate is only as good as the numbers you feed it. A beautifully structured cost plan means nothing if the rates are based on guesswork or last year’s national averages. To get this right, you have to become a master at sourcing, questioning, and blending different types of cost data.

This isn’t about a quick Google search. It’s about tapping into credible, industry-standard sources and stress-testing those figures against what’s happening on the ground, right now. A defensible estimate isn’t built on a single source of truth; it’s built by triangulating reliable data points.

Starting with Top-Down Industry Benchmarks

For those early, high-level viability checks, you need a solid starting point. Established industry publications give you that standardised, top-down view of costs across the UK.

There are really only two players you need on your radar:

  • BCIS (Building Cost Information Service): Run by RICS, this is the gold standard for UK cost data. It gives you detailed cost analyses and, crucially, location-specific indices to adjust national averages for your region. Its real power is in its forecasting for inflation and market trends.
  • Spon's Price Books: These are the encyclopaedias of construction costs. They provide incredibly granular unit costs for thousands of items, letting you price everything from a specific type of brickwork to a complex mechanical installation.

But here’s the catch: these resources are benchmarks, not quotes. They represent an average market rate and can’t always capture sudden price shocks or the specific supply-and-demand dynamics in your local area.

Practical Example: You might use BCIS to find that the average cost for brickwork in the North West is £95/m². This is a great starting point, but you must validate it. Treating these price books as gospel is a classic mistake.

Getting Bottom-Up, Market-Tested Pricing

This is where your estimate gets real. To find out what your project will cost today, you have to talk to the people who will actually build it. You need on-the-ground intelligence.

Bring a good local quantity surveyor (QS) or contractor into the loop early. A QS lives and breathes this stuff; they’ll have a far more current and nuanced view of labour and material rates in your specific postcode than any national price book.

Likewise, sending an informal pricing exercise to a couple of trusted local contractors is an invaluable reality check. Their feedback will tell you instantly if your benchmarked costs are in the right ballpark or if a particular trade is in high demand and charging a premium. This live market feedback is non-negotiable for a robust budget.

The Power of Triangulation

The most resilient estimates blend these different data streams. This triangulation protects you from the risks of relying on a single, flawed source.

  1. Start Top-Down: Use BCIS or Spon's to build your initial elemental cost plan, adjusting the figures for your region and project type.
  2. Add Your Own Data: Layer on the costs from your own completed projects. What did you actually pay for groundworks or roofing on your last job? This historical data is your secret weapon.
  3. Validate Bottom-Up: Finally, get a reality check on your key trade packages from a local QS or contractor. This will either confirm your assumptions or flag a major discrepancy before it becomes a real problem.

This approach has been critical over the past few years. UK construction material prices for new houses shot up by a staggering 53% between 2015 and mid-2022, thanks to supply chain chaos and rampant inflation. Even by late 2023, the 'all work' material price index was still climbing, showing just how fast benchmark data goes stale. You can track these trends yourself using the latest government data on building materials.

By triangulating, you create a multi-layered, defensible estimate that stands up to scrutiny because it reflects both industry standards and on-the-ground reality.

How to Stress-Test and Present Your Numbers to Lenders

Getting your cost plan right is only half the battle. To actually secure funding, you need to prove it’s resilient. Lenders don't just look at your numbers; they’re paid to be pessimistic and will actively look for the breaking points in your financial model. Your job is to get there first.

Anticipate their questions. Show them you’ve done the hard thinking for them. It’s the difference between being seen as a professional operator who understands risk and a developer with an optimistic spreadsheet. This approach builds lender confidence and, frankly, gets deals done faster.

A man in a suit presents to a diverse group of people in an office, with a 'LENDER READY' sign.

Running Scenarios to Test Your Appraisal

First, stop treating your appraisal as a static report. It’s a dynamic model, and you need to run multiple “what-if” scenarios to understand where its financial weak points are. This sensitivity analysis is a standard part of any lender’s due diligence, so it should be a standard part of yours.

Pinpoint the most sensitive variables in your budget—usually the biggest cost lines or the ones most likely to fluctuate.

A proper stress test will give you clear answers to questions like:

  • Cost Overruns: What happens to my profit and return if total build costs climb by 5%, 10%, or even 15%?
  • Sales Value Dip: If the final Gross Development Value (GDV) drops by 5% or 10%, can I still repay the loan and turn a profit?
  • Programme Delays: What’s the monthly burn rate for finance interest and prelims? What does a three or six-month delay do to my bottom line?

Practical Insight: Lenders will run these scenarios even if you don't. By presenting your own stress tests upfront, you demonstrate control, transparency, and a real grasp of your project's financial weak spots.

Think about a real-world pressure point like labour costs. Over the last decade, UK construction wages have jumped by around 45%, blowing past the rate of house price growth and squeezing developer margins hard. Showing you've modelled for another 10% hike in labour proves you’re not just hoping for the best—you’re planning for reality.

Assembling a Lender-Ready Evidence Pack

Once you’ve battle-tested the numbers, you need to assemble the evidence that proves them. Lenders want to see the data behind your assumptions. The goal is a professional, transparent, and auditable pack that makes their underwriting process as smooth as possible.

This isn’t just about showing your working; it’s about proving the quality of the data you used to estimate construction costs. A messy submission with unsubstantiated figures is a huge red flag.

Your evidence pack should be structured and contain these essentials:

  • Formal Quantity Surveyor (QS) Report: The cornerstone. An independent report from a RICS-accredited QS gives your budget instant credibility.
  • Contractor Tenders: If you're at that stage, include formal tenders from reputable contractors. This is real-world pricing, and it’s far more powerful than benchmark data.
  • Supplier Quotes: For big-ticket items like windows, kitchens, or cladding, include formal quotes to justify your cost allowances.
  • Professional Fee Proposals: Show the signed proposals from your architect, structural engineer, and other key consultants.
  • Data Sources: If you've relied on sources like BCIS, be explicit about the indices and any regional adjustments you’ve applied.

Organising this information makes your case for funding infinitely more compelling. Platforms with specialised property finance and underwriting tools are designed for this, helping you structure the evidence and present it clearly. It shows a lender you’re not just organised, but you’re using modern tools to manage risk.

Ultimately, presenting to lenders is about demonstrating a robust process. You show them you’ve built a detailed estimate, stress-tested it against realistic market shocks, and have the paperwork to back up every single line item. That professional approach is what separates the developers who get funded from those who don’t.

Common Questions We Hear on Construction Costing

Even with a solid process, the same questions pop up time and time again when estimating construction costs. Getting straight answers builds the confidence you need and helps you sidestep the common traps that sink otherwise decent project appraisals.

These are the questions UK developers ask us the most.

How Accurate Is a Cost Per Square Metre Estimate?

A cost per square metre (£/m²) is a brilliant tool for a back-of-the-envelope feasibility check. Nothing more. You should absolutely not be taking a £/m² number to a lender. It's a blunt instrument, and its accuracy is low because it completely ignores the project-specific details that actually drive costs.

For a start, a simple £/m² rate tells you nothing about:

  • Site Conditions: The enormous cost difference between a flat, clean site and a sloping one that’s riddled with contamination.
  • Quality of Finishes: The specification for kitchens, bathrooms, and flooring can swing the final build cost dramatically.
  • Abnormal Groundworks: A simple area-based metric won't capture the need for piling or deep foundations if you've got poor ground conditions.
  • Regional Labour Rates: Costs in London versus Liverpool are worlds apart.

Practical Insight: Use a £/m² figure to quickly sanity-check a new opportunity. For instance, if you know high-spec flats in Birmingham cost roughly £2,500/m² to build and a site you're looking at only works on paper at £1,800/m², you know immediately it's a non-starter. But the moment you decide to move forward, you must switch to a detailed elemental or trade-by-trade cost plan to get funded and manage the job properly.

What’s a Reasonable Contingency Percentage?

There’s no magic number. A lot of people throw around 5-10%, but the right contingency is all about risk, not some generic rule of thumb. That percentage can—and should—swing wildly based on how many unknowns your project has.

Look at these two scenarios:

  1. A Low-Risk Project: A simple new-build on a clear site with full planning and detailed ground investigation reports might only need a 5% contingency. The risks are known and limited.
  2. A High-Risk Project: A complex refurb of a listed building, where you have no idea what structural horrors or hazardous materials you’ll uncover, could easily demand a 15% or even 20% contingency just to be prudent.

The professional way to do this is with a formal risk register. List every potential risk, give it a probability, and estimate the cost impact. That analysis lets you build a contingency figure you can actually defend—something lenders will see as well-reasoned, not just a guess.

How Often Should I Update My Cost Plan?

Your cost plan is a living document. It’s not a one-and-done estimate you file away once the funding is secured. A static budget is guaranteed to be wrong by the time you reach practical completion. For any real financial control, regular updates are non-negotiable.

I recommend a full update at every key project milestone:

  • After the initial site surveys are in.
  • Once you have planning permission (and all its specific conditions).
  • During the detailed design and technical specification phase.
  • After the main contractor tender process is wrapped up.
  • And, crucially, monthly during the build to track your actual spend against the budget.

This rhythm means you always have an accurate financial picture. You can make informed decisions and get ahead of potential overspends before they spiral.

Which Is More Important: Hard Costs or Soft Costs?

This is a false choice. It's a common but dangerous mistake to obsess over hard costs (bricks, mortar, labour) while glossing over the soft costs. Both are equally critical to your project’s viability.

Of course, hard costs make up the bulk of your construction budget. But soft costs—professional fees, planning applications, marketing, finance charges—can easily add up to 20-30% of the total project cost. Underestimate these, and you can wipe out your profit margin just as surely as a major build cost overrun. A professional cost estimate gives both categories the detailed attention they deserve.


Ready to move beyond fragmented spreadsheets and build lender-ready appraisals with real confidence? Domus is a connected UK property development platform that unifies viability, planning, and finance in one workflow. You can model your entire project, stress-test scenarios in an instant, and create the auditable evidence packs that get funding decisions over the line faster.

See how you can deploy capital with higher confidence at https://www.domusgroups.com.